Monday, July 30, 2012

Days 63 ~ 73

          During Days 63 ~ 73


Front with Shingles and Windows.


Back side of the Greatroom, looking at the Fireplace.

Looking out the Front door with the Study on the
left and the Dining Room on the right.

Looking into the Dining Room.

One of the Boys Bedrooms.

Boys Shower/Tub.
So far they have installed the Heating/Air Unit,
Plumbing, and Electrical Wiring, Master Shower, Tub,
and Boys Tub/Shower, Windows, and Backdoor.

No comments:

Post a Comment